Inspection Checklist for Deck Machinery and Steering Gear

Deck machinery and steering gear operate in harsh marine environments, making wear and deterioration unavoidable. When a failure occurs, it can lead to delays in operation schedules and reduced safety, and in some cases may result in significant losses. Regular inspection and maintenance are an effective way to prevent such risks in advance.

Importance of General Inspection and Periodic Maintenance

— To Ensure Safe Operation —

  • Early detection of minor issues helps prevent major failures.
  • Extends the lifespan of machinery and contributes to cost reduction.
  • Ensures compliance with safety standards and provides peace of mind for the crew.

Checklist

No. Title Download Issue Date
1 Checklist PDF:530KBpdflink Nov,2023

Inspection and Maintenance Recommendations

  • If you send us the inspection checklist, we will propose a planned after-sales service program.
  • For deck machinery, we recommend an onboard inspection (general deck machinery inspection) by our specialized technicians approximately 6 to 12 months prior to the scheduled dry-docking.
  • For requests for inspections, maintenance, or consultations regarding after-sales service, please feel free to contact us via the “Contact” form.
  • Note: When making an inquiry, please include information such as the vessel name, hull number, year built,and the model of the equipment in the inquiry form.

Checklist

No. Title Download Issue Date
1 Checklist for 2 pump units PDF:400KBpdflink Feb,2026
2 Checklist for 3 pump units PDF:404KBpdflink Apr,2026
3 Checklist for 4 pump units PDF:411KBpdflink Jul,2025

Inspection and Maintenance Recommendations

  • If you send us the inspection checklist, we will propose a planned after-sales service program.
  • For steering gear, we recommend periodic overhaul carried out by our specialized technicians. Please refer to the table below for the recommended intervals.

Maintenance Plan Ex. 2 Pump Units type

Option 1:Overhauling 2 pumps in 5yearly dock

Age 5 10 15 20
Plan Overhaul
2 pump units
Overhaul
2 pump units
Overhaul
2 pump units
Overhaul
2 pump units
Standard
spares
Repair kit Repair kit

Shaft and cylinder
Repair kit Repair kit

Shaft and cylinder
Optional
spares
Electrical
equipment
Electrical
equipment
Slide plate: H = 0.5 mm
Roller bearing: B = 0.5 mm
Hardened steel plate: A = 0.5 mm
V–Packing: X = 0 mm or use over 5 years

※Repair kit = all seals + all bearings + all sliding components
※Shaft = drive shaft + tapered roller bearing + pistons

Inspection and Maintenance Recommendations

  • For requests for inspections, maintenance, or consultations regarding after-sales service, please feel free to contact us via the “Contact” form.
  • Note: When making an inquiry, please include information such as the vessel name, hull number, year built, and the model of the equipment in the inquiry form.

Contact

Please feel free to contact us if you need more information about our business or want to purchase our products.

CONTACT