Submarine Kokuryu Delivered
Mar. 09, 2015
Tokyo, March 9, 2015 — Kawasaki Heavy Industries, Ltd. today held a ceremony marking the delivery of the submarine Kokuryu to the Japan Ministry of Defense (MOD) at its Kobe Shipyard’s Nishihama Quay at 11:30 AM. The ceremony was attended by a delegation of top JDA officials.
The submarine is the 6th Soryu class submarine built by Kawasaki, and the 26th built at this shipyard after World War II.
It provides superior submerged operations and propulsion performance, and uses high tensile steel for its hull. It also has Stirling engines for increased underwater endurance, a variety of automated systems, improved surveillance capabilities using high-performance sonar, increased stealth capabilities, and enhanced safety measures.
The submarine’s specifications are as follows:
Construction started: | January 21, 2011 |
Launched: | October 31, 2013 |
Completed: | March 9, 2015 |
Specifications | |
---|---|
Length: | 84.0m |
Beam: | 9.1m |
Depth: | 10.3m |
Draft (normal): | 8.4m |
Displacement: | 2,950 tons |
Engines: | Kawasaki 12V 25/25 SB-type diesel engines (2) Kawasaki Kockums V4-275R Stirling engines (4) Electric propulsion motor (1) |
Propeller: | Single propeller |
Speed: | 20 knots |
Armament: | Underwater launch tubes |
Other: | Submarine snorkel |